Testing and documents

How our cable assemblies are tested

What gets checked, what gets recorded, and what we can put in a file for your importer. This page is deliberately specific, because a quality claim without a test and a document behind it is just a paragraph.

100% continuity and pinout IPC/WHMA-A-620 workmanship RoHS and REACH declarations First article reports
Control points

Where a defect gets stopped

Inspecting only the finished carton tells you what you already shipped. The checks that matter sit earlier, where a bad batch is still a small batch.

Incoming

Wire gauge and strand count checked against the bill of materials, connector authenticity checked by supplier lot, and jacket compound verified against the material certificate before a reel goes to the line.

In process

Crimp height and pull force sampled through the run, strip length measured, and moulding parameters logged. A drifting crimp tool shows up here, not at the customer.

Final

100% continuity and pinout on every assembly, with the test record kept against the work order. Visual inspection against the approved sample and the artwork proof.

Outgoing

Carton count, labels, barcode scan check and packaging condition. Export marks and shipping marks verified against the packing list before the container is sealed.

Test methods

What the report can actually say

Tests, and whether they are routine or optional
TestWhat it catchesCoverage
Continuity and pinoutOpen, short, crossed or missing connection100% of units
Hipot (dielectric withstand)Insulation breakdown between conductorsPer drawing, usually sample or 100%
Insulation resistanceMoisture ingress and contaminated compoundSample, per agreed limit
Crimp pull forceUnder-crimped or over-crimped terminalSampled through the run
Insertion and withdrawal forceContact wear and out-of-tolerance plug shellSample per lot
Mating cycle lifeContact plating and retention over timeOn request, destructive
Flex and bendJacket cracking and conductor fatigue at the strain reliefOn request, destructive
Salt sprayPlating and terminal corrosionOn request, hours per drawing
DimensionalLength tolerance, overmould envelope, print positionSample plus first article

The parameters, not just the test names, are what you should ask for. "Hipot tested" means nothing without the voltage, the duration and the pass threshold, and those are agreed on the drawing.

Paperwork

The file that ships with the goods

  • Commercial invoice and packing list, HS code matched to the cable type
  • RoHS declaration covering the ten restricted substances, against the approved bill of materials
  • REACH SVHC declaration, with the candidate list version stated
  • Material declaration from the wire and compound supplier
  • Electrical test record for the production run
  • First article inspection report, with the approved sample retained
  • Certificate of origin, and Form E or Form A where the destination requires it
  • Fumigation or heat treatment mark on timber pallets where the country demands it

Tell us the document set at quotation. Reconstructing a declaration after a container has sailed is slow, and an importer who cannot clear goods does not place a second order.

Position on certification

What we claim, and what we do not

Most supplier sites carry a row of approval logos whether or not they hold any of them. Buyers have learned to discount all of it, which harms the factories that do hold certificates. This is our position.

We build to the standard you name. If your drawing specifies a UL style, a VDE cable type, an IPC class or a USB-IF test, we source to that specification and document the build against it.

We do not display a listing we do not hold. Where a certificate belongs to the material supplier or the connector manufacturer, you get their document, not our logo on a copy.

We tell you when an approval has to be in your name. Several markets register the approval to the brand rather than the factory. That is a different process with a different cost, and it belongs in the quotation rather than in a surprise.

Ask a supplier for the certificate number and the holder's name. If the answer is a picture of a logo rather than a document, you have your answer.

Field failures

Why cheap cables come back

These are the six that account for most returns in this category. Each one is a decision made at quotation, which is why the specification conversation is worth having.

Failure modes and their root cause
What the customer seesWhat actually happenedWhere it was decided
Charges slowly, or not at 100WNo E-Marker, or a marker declaring less than the charge contract needsBill of materials
Gets hot at the plugVBUS conductor too thin for the current over that lengthConductor gauge
Jacket splits at the strain reliefRigid PVC where the cable flexes, or a mould that grips instead of relievingCompound and tooling
Data drops to USB 2.0 speedsShield coverage below what the rate needs, or an unterminated drainConstruction
Connector feels loose after a yearGold flash too thin, contact spring relaxedPlating specification
Fails a retail compliance testPhthalate plasticiser in low-cost PVC, or a declaration that does not match the actual BOMCompound selection

None of these can be inspected into a finished cable. They are all decided before the first metre is cut, which is the argument for spending the time on the drawing rather than on the price.

Questions

Quality and documents, asked directly

Can I send a third-party inspector?

Yes, and it is a reasonable thing to do on a first order. Tell us the booking date when you have it and we will have the goods staged and the records ready. We do not schedule production around the inspection in a way that leaves nothing to inspect.

Do you provide a test report for every order?

You get the electrical test record for the run, which shows the parameters tested and the result. Destructive tests such as flex life, salt spray or mating cycles are quoted per request because they consume samples, and the report names the sample size so nobody mistakes a lot test for a qualification.

What is a first article inspection report?

A record of the first parts off a new or changed build: every dimension on the drawing measured and written down, the materials used, and the result. It is what turns "it looked right" into a document both sides can point at when the tenth run is questioned.

Is ISO 9001 certification the same as product certification?

No. ISO 9001 certifies a management system, meaning the factory documents and follows its processes. It says nothing about whether a particular cable meets a safety standard. A supplier who offers ISO 9001 as proof that the product is approved is either confused or hoping you are.

How long do you retain records?

Records for a production run are kept so a repeat order can be built against the same reference, and so a question raised months later can be answered with data rather than memory. If your programme has a retention requirement, state it in the purchase order and it will be honoured.

Ask for the document, not the logo

Tell us the market and the tests your importer will ask about. We will send the actual file set we can provide, including the parts we cannot, before you commit to anything.